Nip Impressions logo
Fri, Jul 10, 2026 17:50
Visitor
Home
Click here for Pulp & Paper Radio International
Subscription Central
Must reads for pulp and paper industry professionals
Search
My Profile
Login
Logout
Management Side

Eneco to install new secondary superheater at Delfzijl biomass boiler

Eneco will install a new secondary superheater in the circulating fluidized bed boiler at its Bio Golden Raand biomass plant in Delfzijl, the Netherlands, according to the technology supplier Valmet.

The delivery includes a turn-key replacement covering engineering, manufacturing, and installation. The new superheater is designed as a one-to-one replacement to enable seamless integration with the existing CFB boiler and minimize installation time during the planned outage. Installation will be carried out by Valmet's own service team.

The CFB boiler was originally supplied by Valmet in 2013. The combined heat and power plant uses recycled wood as fuel to produce renewable electricity for the local community and steam for an industrial plant.

No order value was disclosed. Delivery and installation are scheduled for March 2027.

Eneco is a Dutch energy company operating the Bio Golden Raand biomass plant in Delfzijl, the Netherlands.

Valmet is a global technology leader in serving process industries.



 


 Related Articles:


 


Powered by Bondware
News Publishing Software

The browser you are using is outdated!

You may not be getting all you can out of your browsing experience
and may be open to security risks!

Consider upgrading to the latest version of your browser or choose on below: